References

The Company of ELEKTROTIM S.A. offers a large range of products, requiring both technical and organizational competences. The advantages offered to our customers is high professionalism of our employees, assistance at each stage of investment’s realization, the highest quality of recommended products, solidity, flexibility and innovation. We undertake complex tasks, in which we use knowledge and experience of our employees.

SUBJECT OF IMPLEMENTATIONORDERING PARTYREFERENCE
Reconstruction of the basic ZP-1, ZP-3, ZP-4, ZP-6 rectifier units with transformers at the Department of Copper Electrotreatment at the „Legnica” Copper Smelter.  KGHM ZANAM S.A.
Design and modernization of a lighting installation and BMS system for the Sport & Show Hall SPODEK in Katowice. ENEA OPERATOR Sp. z o.o. Oddział Dystrybucji Szczecin  pdf
Current maintenance of national roads No. 5, 36, 94 in the Wołów Region, divided into tasks: Task No. 5 - electro-energetic works. Generalna Dyrekcja Dróg Krajowych i Autostrad Oddział we Wrocławiu pdf
110 kV wire line and construction of the GPO  (Main Collection Point) station to supply the battery separator production plant in Dąbrowa Górnicza. SK hi-tech battery materials Poland pdf
Provision of maintenance services on linear powerline facilities of PSE S.A. Polskie Sieci Energetyczne S.A. w Bydgoszczy pdf
Expansion of the 110/20 kV Przybków station in Legnica.  Tauron Dystrybucja S.A
pdf
Construction of a gravity sewage system and a pressure sewage system with sewage pumping stations in Psary, Wisznia Mała commune.  Przedsiębiorstwo Gospodarki Komunalnej Sp.  z o.o. w Wiszni Małej
Reconstruction of ul. Fabryczna and ul. Otyńska - construction of a rainwater drainage system on the 5KD road.  Wrocławskie Inwestycje Sp. z o.o.
 
Reconstruction of the water intake in Leśnica - Stage III along with obtaining an occupancy permit.  MPWiK S.A. we Wrocławiu
 Reconstruction of the road system with traffic organization to provide communication services for a complex of multi-family residential buildings with services in the former Piast Brewery. Archicom Sp. z o.o.  
Design and construction of the Lubin-West Road Maintenance Circuit.  Berger Bau Polska Sp. z o.o.
Renovation of street lighting in the Skoczków commune with the use of LED technology.  Urząd Miejski w Skoczowie
Christmas illumination in Wrocław in the winter seasons 2018/2019 and 2019/2020.  Zarząd Dróg i Utrzymania Miasta we Wrocławiu

Wiring of the double-circuit overhead 110 kV S-149/S-150 power line at Popowicka Street in Wrocław to free plots of land for planned investments.

 Port Popowice Sp. z o.o. Sp. k.
 
Wiring of three double-circuit overhead 110 kV S-161/S, S-163/S and S-165/S-166 power lines at Gnieźnieńska Street in Wrocław to free the plot for planned investments.  Lokum Developer
 
Replacement of RNN-1.10.1 500 V, RNN -1.12.1/1 500V switchgears, as part of the task: „Replacement of medium and low voltage switchgears in the ZWR Rudna area; JGZW/TP/18/51998”. KGHM MIEDŹ S.A.
 
Design and performance of traffic lights at the intersection of the national road no 8 in Duszniki Zdrój town.  Generalna Dyrekcja Dróg Krajowych i Autostrad Oddział we Wrocławiu  
Delivery and mounting of a station: SO-4, SO-7, SO-5/6, modernization of energy consumption measurement and settlement unit, exchange of the RG-1 switchgear for a switchgear of Prisma P type, delivery, mounting and launching of a passive power compensation battery.  RÖBEN Ceramika Budowlana w Środzie Śląskiej  
Building of navigation lighting system of „CALVERT” type in Dęblin.  12 Terenowy Oddział Lotniskowy w Warszawie  
Delivery and installation of electric installation systems for Górnoslaski Retail Park in Katowice Ltd.  Górnośląski Park Przemysłowy w Katowicach Sp. z o.o.  
Modernization of airport surfaces for 12 Terrain Airport Department in Warsaw.  HEILIT+WOERNER Budowlana Sp. z o.o.